Wind Power Headaches

Headwind: Asian Wind-Power Upstarts Stumble - about an Indian company, Suzlon Energy Ltd. that is having major issues breaking into the US market.
  • Wind turbines cracking
  • Heaters needed for controls in snow areas
  • New design needed for 60 Hz (India uses 50 Hz)
  • Equipment is breaking down more than contracted for
  • Power produced is not what was promised
Very entrepreneurial, sell, sell, sell. And fix the problems later. And since the competition is 25% more and booked through 2010, they needed to take advantage of the window. Could they have waited 6 months to do some testing that would have show up the problems?

Peter Drucker always start small and test to find out what works, and then expand.